How it goes up
Installation
Pole attachment, subscription hardware, 30-day removal clocks, as-builts. Public consent is optional until a statute says otherwise.
Local
Consent agenda, then a pole
Install is often bundled into the subscription: vendor crews, existing poles, solar. Public hearings are not required unless local policy or state law says so. Some deployments have gone up without the permit the DOT later said was required.
Pull the item off consent. Ask for as-builts and the pole owner.
County
Rural corridors, high yield for the network
County-line and arterial poles fill gaps between city clusters. That is how a ‘local’ system becomes statewide in practice without a statewide vote.
Ask for a map of county-owned vs vendor-owned poles.
State
A 30-day clock is not a statewide teardown
FDOT’s clock runs on SHS right-of-way. County and city installs continue unless those owners act. After-action ‘still in violation’ claims need a sourced remaining-device report. Map tags are not that report.
Watch the DOT after-action, not the crowd map.
Federal
The network is the product
CRS (3 Sep 2026) cites crowdsourced counts north of 137,000 ALPR cameras at the end of August, with over 80% attributed to one vendor. That map is a floor, not a census. Installation is local. The searchable database is national. That mismatch is the policy problem.
Talk about the database, not only the pole.
Comments in this lane
Poles without a hearing
Cameras go up on a consent agenda, a grant, or a pole-attachment. Public consent should come first. That is a state bill. Petition: https://orwellday.com/stop-flock-solution/
It is a subscription
Most of these systems are annual subscriptions — hardware, cloud, and national search bundled. Renewal is a scheduled second chance. Or the state can end the class. Petition: https://orwellday.com/stop-flock-solution/